Skip to main content
All guidesStandards

How to Read a Chimney Inspection Report — And Spot One That Says Nothing

A report that says 'some creosote, recommend sweep' has told you nothing you can act on. What a defensible report actually contains, field by field.

The Chimney Standard Team
Reviewed by our CSIA-certified crew
9 min read

Most homeowners receive a chimney report and have no way to judge whether it is thorough or worthless. The difference is not length or presentation — it is whether each finding is specific enough that a second contractor would reach the same conclusion from it. Here is what to look for, field by field.

01It must state which level was performed, and why

A report should name the inspection level and the reason it was chosen. Level 1 is a visual check of readily accessible portions and is only appropriate when nothing has changed. Level 2 adds accessible concealed areas and an internal camera scan, and the standard requires it after an operating malfunction, an external event such as a chimney fire or storm, on sale or transfer, and on any change of appliance or fuel.

If a triggering event occurred and the report says Level 1, the wrong scope was performed. That is not a judgement call, and it is the single most useful thing you can check first.

02Creosote must be reported by stage, not by presence

'Some creosote' is not a finding. The stages behave completely differently: Stage 1 is a dry soot that brushes out, Stage 2 is crunchy and flaky and still mechanically removable, Stage 3 is a hard glaze that is what actually sustains a chimney fire.

The report should state the stage and where in the flue it was found. The stage determines whether the correct response is a sweep, a chemical modifier, or taking the flue out of service — three very different outcomes and three very different prices.

03Every defect needs a location and a photograph

'Crown cracked' is weaker than 'crown cracked, two hairline and one through-crack at the north-west corner, photographed'. The second can be re-checked next year to see whether it moved. The first cannot.

This matters most for anything you decide to monitor rather than fix. A defect you are deferring needs a baseline, or you are not monitoring it — you are forgetting it with extra steps.

04Liner findings require a scan, not an opinion

A verdict on liner condition delivered without an internal camera examination has not examined the thing it is reporting on. The scan produces an image with a location, and a relining quote should be built from that image.

If you are being quoted a reline, ask to see the scan. This is the single largest line item in chimney work and it is the one most worth verifying.

05What a report should NOT contain

Recommendations without findings. If the report proposes work, each item should trace to a specific documented defect. A list of services with no corresponding findings is a quote wearing a report's clothes.

Also: certification claims without numbers. Certifications in this trade are held by individuals and are publicly verifiable in under a minute, which is exactly why a claim without a number is worth questioning.

Bottom line

Check the level against whether a trigger occurred, check that creosote is staged, and check that every defect has a location and a photo. Three checks, and they separate a report you can act on and re-verify from one that exists to justify a quote.

The documented next step

Every recommendation in this guide starts from one place: a graded, photographed inspection. Book a inspection — one standard, one paper trail, every job.

Common questions

Frequently asked

01Should every inspection be a Level 2?

No. Level 1 is the correct and sufficient scope for an unchanged system in continued service under the same conditions. Level 2 is required when something has changed or an event has occurred — sale or transfer, a chimney fire, an operating malfunction, a significant weather event, or a change of appliance or fuel.

02My report has no photographs. Is that a problem?

It limits what the report is worth. Without images you cannot verify a finding, compare it next year, or show it to a second contractor. Ask for them — any inspector working to a professional standard is already taking them.

03How long should an inspection take?

Long enough to reach what the level requires. A Level 2 that includes attic or crawl access and an internal camera run cannot be done in fifteen minutes, and a visit that short has not covered that scope whatever the invoice says.

15+
Years in the field
NFPA 211
Checklist
48h
Written report
< 2hr
Response
Ready when you are

Get it inspected. Get it in writing.

Flat fee confirmed when you book. Same-week scheduling. A pass/fail verdict within 48 hours.

Licensed & Insured Same-Week Scheduling Photo-Documented Findings
Emergency

24/7 Response

Chimney fire, storm hit, active leak, or a flue you're not sure about? We answer 7 AM to midnight and the assessment ends in a written safe-to-use verdict — including a do-not-use notice when the evidence supports one. After-hours dispatch runs subject to crew availability.

Emergency line
Call NowBook